Looks new looks really nice but also looks like the same we had. The custom orange barely looks different. Feels like we could have missed on an opportunity here if the end zones end up the same
Photo by Robert Allen - Pokes Report
Oklahoma State Football
New Turf Surface at Boone Pickens Stadium Progressing
STILLWATER – The project inside Boone Pickens Stadium is continuing and is on pace to be finished in plenty of time by the end of the month and the start of fall camp as the players report on Aug. 1 and will begin practice on Aug. 3. The new surface, both inside Boone Pickens Stadium and on the practice field outside and east of the Sherman Smith Training Center. The former surface in both locations and inside the Sherman Smith Center was produced by AstroTurf (AstroTurf3D).
Never miss the latest news from Pokes Report!
Join our free email list